Senior Electrical Engineer questions political risk of Czisch type supergrid

Bernard is a senior electrical engineer and has sat on many generation industry committees. He writes:

“I unfortunately missed the House of Commons presentation. I think we all agree the we could overcome technical problems at a price. However how do we overcome the political risk ? In the coal, nuclear, oil and gas areas this is dealt with by storage and multi sourcing. I don’t know how we factor in the cost of occupying a country while alternative supplies are built – even if it were possible. Any comments”

Admin writes:

Regarding political risk.

All turbines can be in EU not in dodgy foreign countries.

First of all, lets be clear, the Czisch concept / proposition is not built solely on the assumption that supplies coming from Egypt, Kazakhstan and so on as many people in this group seem to wrongly assume. The key point is that a supergrid be built linking up the EU states including Iceland and Norway. This has enormous technical and economic benefits for all power generation (but not the companies owning them – it introduces a free market which I am in full support of, but they are not), and will make the whole thing more efficient, by allowing plants to run smoothly, and lead to the obsolescing of numerous inefficient existing stations which will no longer be needed and a massive reduction in expensive spinning reserve and hot standby (- this is the key reason why there is no support form the big players – it will strand many of their assets and make it unnecessary to build a lot of the new coal plant they want to, irrespective of any renewables. Just as building the UK supergrid in 1930 made a lot of UK power stations redundant, and forced a lot of those local monopolies out of business.) However putting a lot of wind farms in far flung places is the cheapest way of getting power – but that is only one option!. If we don’t do it, and put all the turbines within EU proper, it costs a bit more, but not a lot. (Mark Barrett has already shown this

Read More

National Grid's views on 36% wind in UK power generation mix

Dear all,   Regarding the concerns expressed in this dialogue (on the claverton mailing list – ed) regarding the intermittency of wind and the risk to the transmission network of having a large percentage of wind generation on the network.   The National Grid has in the last year established what it calls its “Gone […]

Read More

Active Power Article – Flywheel energy storage

Summary – this article offers compelling reasons for using a flywheel in combination with a diesel generator for UPS. Essentially batteries are the weakest point of any generator, and the flywheel eliminates the need for them, by storing enough energy to start the generator, and to provide no break power whilst the generator is starting. This article is written by and features Active Power who manufacture these systems.

As compared to other energy storage technologies (i.e., flow battery, compressed air, hydrogen, lithium ion battery, etc.), flywheel technology is a very mature, field proven technology. It’s worth noting Active Power was the first to commercialize a mechanical flywheel energy storage system and soon after patented the integration of UPS electronics with flywheel energy storage. Flywheel operation is very well understood and Active Power alone has more than 2,100 flywheels deployed in the field to date with more than 55 million hours of runtime. Flywheels present the most power dense energy storage technology when used as a bridging device between an outage and on to a generator.

Read More

Why Do We Need The Supergrid, What Is Its Scope And What Will It Achieve?

Claverton House of Commons Presentation, 19th June 2009  Note – The Claverton Energy Groupcomprises about 300 independent energy experts who discuss energy issues. Not all members support the Supergrid concept, however a significant proportion, if not most, do. Dr Czisch presented at a recent Claverton Conference held at the Headquarters of Wessex Water in Bath […]

Read More

No more queue for transmission access in UK?

According to Paul….. transmission capacity, – there is no longer any queue following the 8th May Ofgem letter (publications page, Ofgem website) that interim connect and manage is now in force. Grid published its own letter Thursday 21st May confirmed that 2 GW of Scottish new generators had asked to be advanced under ?interim connect […]

Read More

Renewable European Supergrid – text of submitted article to Independent on Sunday

Europe could build an electricity supply based entirely on renewable energy by 2030, according to scientists making a presentation at the House of Commons this week. MPs will hear that an electricity ‘supergrid’ across Europe and North Africa could solve the problem of the intermittency of wind turbines and solar power, and dispense with the need for nuclear and ‘clean coal’ power stations altogether

Read More

Electrical review magazine

ER magazine has it’s own Twitter feed: www.twitter.com/elecreviewmag All their latest stories and features are posted up including Gossage and Blown fuse.

Read More

Note from TREC on extra supergrid / DESERTEC links

Hi Andrew, House of Commons presentation, June 18th 2009- European Supergrid and 100% Renewable Energy Congratulations on organising the above meeting at the HoC about supergrids and thanks for your support in that area. In connection with supergrids, you may be interested to put some or all of the following links on to the website […]

Read More